SS Hopper Installation
A recent installation of edp manufactured Stainless Steel receival hopper in Central NSW.
The unit was designed manufactured and installed under a very tight time frame meeting the customers annual maintenance shut down program.
The challenge was to double the current production rate, but to also reduce the existing OHS problems associated with the current install.
Both the aims were meet with the end installation being on time and on budget.